Community House Road Farm-To-Market (Phase 1 & 2)

 

This project will make improvements to Community House Road from Tamarron Drive to Bryant Farms Road to better serve the community and all roadway users.

What's happened? Construction of Phase 1 from Drive to south of Providence Road West is complete.  Installation of lights and landscaping will occur this winter. Design and permitting of Phase 2 from Providence Road West to Bryant Farms Road is near completion. 

Construction of Phase 1 from Tamarron Drive to south of Providence Road West is complete.  Installation of lights and landscaping will occur this winter. Design and permitting of Phase 2 from Providence Road West to Bryant Farms Road is near completion. 

What’s next?
Lighting and landscaping will be installed in Phase 1, between Tamarron Drive and Providence Road West in winter 2015. construction of Phase 1 from Providence Road West to north of Bryant Farms Road should begin by summer 2015.
 
Who to contact:  Derrel Poole, Project Manager, 704-353-1794.

 

A Transportation Bond Project

In 2012 a bridge connecting Community House Road over I-485 was unexpectedly added to the State’s widening project. The anticipated traffic increase as a result made it necessary to redesign  the Community House Road Farm-To-Market Project from Providence Road West to Bryant Farms Road. 

To allow project improvements south of Providence Rd West to move forward without delay, the project was split into two phases.  Phase 1 will complete improvements to Community House Road from Tamarron Drive to south of Providence Road West. Phase 2 will complete the redesigned improvements from Providence Road West to north of Bryant Farms Road. This project is NOT a road widening. The goal of both phases is to add or improve roadway features to better serve the community and all roadway users, including motorists, bicyclists and pedestrians. 


Phase 1 design and construction are complete. Improvements include:

  • Additional turn lanes
  • New and improved pedestrian crossings
  • Landscaped medians
  • End-to-end uninterrupted sidewalks and bike lanes
  • Additional street lighting

Phase 2 design is complete. Improvements include:

  • A roundabout at the Bryant Farms Road intersection
  • A roundabout at the Willow Rock Drive intersection (and the entrance to Blakeney District Park) 
  • End-to-end uninterrupted sidewalks and bike lanes on Community House Road
  • Sidewalk on the south side of Bryant Farms Road from Community House Road to the YMCA entrance
  • Improved pedestrian crossings 
  • Landscaped medians 
  • Additional street lighting

Phase 2 construction is anticipated to begin in 2016 or sooner.

Click below to download a rendering of the design plans:

Estimated Cost for Phase 1: $3,250,000
Estimated cost for Phase 2: $4,950,000
Please note that the project cost will include all costs associated with the project such as planning and design, acquiring the right of way, utility relocation, consultant fees, construction, signalization, permits and landscaping.   
 
The Engineering & Property Management (E&PM) project team will manage the Community House Road Phase 1 Project through a four stage process.  Specific work is conducted during each stage with an emphasis on public involvement during the planning and design phases. Click here to learn how City projects are selected, designed and built.

Project Contacts:
Derrel Poole, Engineering Project Manager, 704-353-1794
Tom Sorrentino, PE, Transportation Project Manager, 704-336-3934