Home
About E&PM
Projects
Resources
Services
Print this PageSite Feedback

CMCSI Recertification

SITE UNDER CONSTRUCTION

If you have a current CMCSI certification you may be eligible for a two-year extension.  To receive your two-year extension you must, within 30 days of your expiration date, complete the following online education modules and fill out the form entitled "CMCSI Recertification Request".

The modules and application should take about 2-4 hours to complete in their entirety

Requirements for CMCSI recertification:

  • Be a Charlotte-Mecklenburg Certified Site Inspector in good standing
  • Complete the online education modules below within 30 days of your expiration date
  • Be actively involved in Soil Erosion and Sediment Control practices, either as a design professional, site operator, builder or inspector
  • Provide a written outline of any activities, classes or ongoing education in the field of soil erosion and sediment control within the preceding 24 months.

MODULE 1:

Become familiar with the principles of erosion control.  Download and read Chapter 2 of the North Carolina Soil Erosion & Sediment Control Sedimentation Control Planning & Design Manual (12 pages) on the principles of erosion and sedimentation

Processes and Principles of Erosion and Sedimentation

When complete, download and print the remaining chapters of the North Carolina Soil Erosion & Sediment Control Sedimentation Control Planning & Design Manual for your reference (Chapters 1-8)If you already have this manual ensure that you have the most recent revision and if not print the relevant sections to add/replace in your existing manual.

The document may be accessed on the North Carolina Department of Environment and Natural Resources PUBLICATIONS website; see hotlink below:

North Carolina Soil Erosion & Sediment Control Sedimentation Control Planning & Design Manual for your reference (Chapters 1-8)

 

MODULE 2:

Recent updates and changes to standards, the planning and design manual and the general permit.  Download and read the following document regarding recent Standards updates to the NC Soil Erosion & Sedimentation Control Planning & Design Manual and Chapter 30 (Erosion Control) of the Charlotte Land Development Standards Manual

Standards Updates

MODULE 3:

Download and read the following document regarding common construction site deficiencies and how they should be documented during self-inspection

Documentation of Common Construction Site Deficiencies

MODULE 4:

The impacts of sediment and other construction site pollutants on the environment.  Download and read the following module  discussing how construction sites can negatively impact the environment and how sites can be managed to minimize impacts. 

 

The Importance of Maintaining a Pollutant Free Site