MecklenburgCountyNC.gov
News
How Do I ...
Online Services
Public Records
Departments
Notify Me
 Code Enforcement:
About Us
Contact Us
Staff Directory
 Most Requested:
Code Interpretations
Electronic Services
Forms
Publications
Permit FAQs
Home Internet Permits
Inspection Failure Reports
Plan Review Failure Reports
Statistical Data
 Land Use &
 Environmental
 Services Agency
 Code Enforcement
 700 North Tryon Street
 Charlotte, NC 28202

 fax 704-336-3839

Inspections

 

How many inspections are required?
Usually two inspections are required for most projects. However, your project may require more inspections. Check with your inspector if you are in doubt. Inspections are required before any of the wiring is covered with insulation, dirt, concrete, or any type of building finish.

When should I call for inspections?
- Rough-in inspections: (prior to installation of insulation or any other building finishes).

- Rough-in inspections: (prior to installation of insulation or any other building finishes).

- All wiring that will be covered by any building finish shall have a rough-in inspection i.e. (walls, ceiling, floors or insulation).

- All outside wiring that will be buried shall be inspected for cable type, burial depth, size, location and so on.

- Final inspections: After ALL fixtures and ALL other electrical equipment is installed and completed.

How do I schedule an inspection?
You may schedule an inspection by MARVIN (automated interactive voice response). Please call 704-336-8000.  Your permit number is required.  You may also schedule your inspection by phone. Please call 704-336-3830.

back to menu

 



Printed from:

on: