Conway/Briabend Storm Drainage Improvement Project
The Conway/Briabend Storm Drainage Improvement Project will reduce flooding and erosion in the project area.  A general description and range of typical timeframes for project phases is given below.  A more detailed schedule will be set at the start of the design phase.
Conway/Briabend Map

Objectives:

- Reduce structure and street flooding throughout the neighborhood.
- Address channel erosion problems within the project area.

Cost:  $7,000,000
Please note that this figure includes all costs associated with the project such as planning and design, utility relocation, consultant fees, construction, permits and landscaping.

The Charlotte-Mecklenburg Storm Water Services (CMSWS) project team will manage the Conway/Briabend Project through the phases listed below.  A general description and range of typical timeframes for project phases is given below.  Specific work is conducted during each phase while an emphasis is made on public involvement throughout the entire project.

Planning Phase (Completed December 2007)
During the planning phase, questionnaires and public meetings are used to obtain input from property owners.  Several improvement alternatives are developed and evaluated to determine the best solution.  The recommended alternative was presented to the public on December 20, 2007 for comment at the end of the planning phase.  The planning phase of a project typically lasts 12 to 27 months. 

Design Phase (Completed July 2010)
During the design phase, construction drawings for the alternative selected during the planning phase are developed.  Many details must be addressed including the determination of specific pipe sizes and alignments, channel widths and lining types, inlet sizes and locations, utility relocations, and easement locations.  The design phase of a project typically lasts 21 to 34 months.

Permitting Phase (Completed July 2009)
During the permitting phase, the required water quality permits are obtained from Federal and State governments.  The permitting phase of a project typically lasts 3 to 9 months.  The permitting phase of a project may overlap other phases.

 Conway/Briabend Map
View a larger map of the proposed project improvement area.
Property Easement/Acquisition (Completed September 2010)
During the planning phase, it was determined that the alternative that most closely met the project objectives included the purchase of seven residential properties along Firwood Lane for the purpose of removing the homes and constructing a dry detention basin along the existing stream.  These seven properties border Collins Park.  The acquisition process for these seven properties has begun and will be completed no later than January 2009.

Easement acquisition for all other areas of the project will begin when the preliminary design plans are completed.  The City's real estate staff will work with citizens and businesses to acquire Storm Drainage Easements (SDEs).  The City requests that SDEs be donated to provide access to your property to make the recommended improvements and provide future maintenance.  In addition to SDEs, temporary construction easements may be needed to access work areas.  The bid phase will begin after all easements are acquired.  The easement acquisition phase of a project typically lasts 8 to 12 months.

Bid Phase (Completed October 2010)
During the bid phase, the final plans will be circulated to qualified contractors for a competitive bidding process.  By state law, the lowest responsible bidder is awarded the construction contract.  The bid phase of a project typically lasts 4 to 5 months.

Construction Phase (Completed June 2012)
Throughout construction, efforts will be made to minimize disruption to nearby property owners. Construction of proposed improvements will be supervised by City inspectors. Notifications of key construction dates and will be mailed to residents prior to construction. 

Project Team

Jennifer Barker, P.E.
City Project Manager
704-432-0963

Scott Ackerman
City Construction Inspector
980-721-3653

Gary Stansbury
City Construction Manager
704-336-2667

Doug Lozner, P.E.
Watershed Area Manager
704-432-0964

Matthew Gustis, P.E.
City Engineering Team Program Manager
704-336-6183

Meeting Minutes

January 29, 2009
December 21, 2007
September 14, 2006

Newsletters

October 2011 
June 2011
February 2011

October 2010

June 2010

February 2010
 
October 2009
June 2009
February 2009

October 2008​​